TEST COMPLETE!
$16 - $22/hr
Entry Level Apprentice
Click below to send results via your email client:
📧 Send Results to SunFusion
0 of 50 answered
Passing: 70% (35/50)
—
Correct
—
Incorrect
50
Remaining
—
Points (of 100)
CANDIDATE INFORMATION
WAGE PLACEMENT SCALE
| Score % | Correct | Wage Range | Classification |
|---|---|---|---|
| Below 70% | 0-34 | NOT PASSING | Retest after 30-day training |
| 70-79% | 35-39 | $16 - $22/hr | Entry Level Apprentice |
| 80-84% | 40-42 | $23 - $30/hr | Apprentice Installer |
| 85-89% | 43-44 | $31 - $38/hr | Journeyman Technician |
| 90-94% | 45-47 | $39 - $45/hr | Senior Technician |
| 95-100% | 48-50 | $46 - $50/hr | Lead/Master Technician |
📋 TEST INSTRUCTIONS:
- You may change your answers at any time before submitting
- Correct answers are not shown until you submit the test
- You must answer all 50 questions before the Submit button appears
- Results will be automatically emailed to SunFusion upon submission
- Passing score: 70% (35/50 correct)
SECTION 1: ELECTRICAL FUNDAMENTALS (Questions 1-10)
Answered: 0/10
1
What is the formula for calculating electrical power (watts)?
Correct: A) P = V × I (Power = Voltage × Current). This is the fundamental power equation.
2
According to Ohm's Law, if voltage increases and resistance stays constant, current will:
Correct: B) Ohm's Law: I = V/R. If V increases and R is constant, current increases proportionally.
3
What is the total resistance of three 30-ohm resistors connected in parallel?
Correct: C) Parallel resistance: 1/Rt = 1/30 + 1/30 + 1/30 = 3/30, so Rt = 10Ω
4
In a 120V/240V split-phase residential system, what is the voltage between the two hot conductors?
Correct: C) Split-phase: 120V to neutral, 240V between hots (180° phase difference).
5
What is the amperage of a circuit with 2,400 watts at 240 volts?
Correct: B) I = P/V = 2400W ÷ 240V = 10 amps
6
What color is the grounding conductor in standard US electrical wiring?
Correct: C) Green or bare copper per NEC 250.119
7
What is the standard frequency of AC power in the United States?
Correct: B) US standard is 60 Hz (Europe uses 50 Hz)
8
What is the minimum ampacity required for #10 AWG copper wire (THHN) in conduit?
Correct: C) #10 THHN = 30A per NEC Table 310.16
9
In a three-phase wye configuration, the line-to-line voltage is approximately:
Correct: C) Wye: VL-L = VL-N × √3 (1.732)
10
What does a Ground Fault Circuit Interrupter (GFCI) primarily protect against?
Correct: C) GFCI detects ground faults (current imbalance) and protects from electric shock.
SECTION 2: SOLAR PHOTOVOLTAIC SYSTEMS (Questions 11-25)
Answered: 0/15
11
What is the primary function of a solar inverter?
Correct: B) Inverter converts DC from panels to AC for home/grid use.
12
What does MPPT stand for in solar technology?
Correct: A) Maximum Power Point Tracking - optimizes power harvest from panels.
13
What is the typical open-circuit voltage (Voc) of a standard 60-cell monocrystalline panel?
Correct: C) 60-cell mono panels typically have 37-40V Voc.
14
Per NEC 690.12, what is the maximum time for rapid shutdown of PV conductors to reduce to 30V or less?
Correct: B) NEC 690.12 requires <30V within 30 seconds.
15
What is the NEC requirement for PV system conductor ampacity calculation factor?
Correct: C) NEC 690.8: 125% × 125% = 156.25% of Isc for conductor ampacity.
16
A hybrid inverter differs from a standard grid-tie inverter because it:
Correct: B) Hybrid inverters integrate battery storage + backup capability.
17
What is the purpose of a rapid shutdown device on a solar array?
Correct: B) Rapid shutdown protects firefighters working on the roof.
18
What is the main advantage of microinverters over string inverters?
Correct: B) Microinverters provide panel-level optimization and monitoring.
19
What temperature coefficient value indicates better performance in hot climates?
Correct: C) Lower (less negative) temp coefficient = less power loss in heat.
20
What is the minimum roof setback required for residential PV arrays per the 2020 NEC?
Correct: D) NEC 690.12 & local fire codes typically require 3ft setbacks.
21
What causes potential induced degradation (PID) in solar panels?
Correct: B) PID is caused by high voltage differential between cells and grounded frame.
22
In a PV system, what is the function of a DC disconnect?
Correct: B) DC disconnect isolates array from inverter for safe service.
23
What is the typical efficiency range for modern monocrystalline solar panels?
Correct: C) Modern mono panels typically achieve 19-23% efficiency.
24
What does STC (Standard Test Conditions) specify for irradiance?
Correct: B) STC: 1000 W/m², 25°C cell temp, AM 1.5 spectrum.
25
A Sol-Ark 15K inverter can handle a maximum PV input of approximately:
Correct: C) Sol-Ark 15K accepts 20,000+ watts PV input (oversizing allowed).
SECTION 3: BATTERY STORAGE SYSTEMS (Questions 26-40)
Answered: 0/15
26
What does LiFePO4 stand for?
Correct: A) Lithium Iron Phosphate (LiFePO₄)
27
What is the primary safety advantage of LiFePO4 over NMC batteries?
Correct: B) LiFePO4 has much lower thermal runaway risk than NMC.
28
What is the nominal voltage of a single LiFePO4 cell?
Correct: A) LiFePO4 nominal = 3.2V per cell (vs 3.7V for NMC).
29
How many LiFePO4 cells in series are needed for a nominal 48V battery system?
Correct: D) 16S × 3.2V = 51.2V nominal (referred to as 48V system).
30
What is the typical cycle life of a quality LiFePO4 battery at 80% DOD?
Correct: C) Quality LiFePO4: 3,000-6,000+ cycles at 80% DOD.
31
What is the function of a Battery Management System (BMS)?
Correct: B) BMS monitors cells and protects from over/under voltage.
32
What is the recommended maximum charge voltage for a 16S LiFePO4 battery?
Correct: C) 16S × 3.6V max = 57.6V maximum charge voltage.
33
What is 'cell balancing' in a battery system?
Correct: B) Cell balancing equalizes voltage across all cells in series.
34
What is the typical recommended storage SOC for long-term LiFePO4 storage?
Correct: B) 50-60% SOC is optimal for long-term LiFePO4 storage.
35
What is the minimum low-voltage cutoff for a 48V LiFePO4 battery to prevent damage?
Correct: C) Minimum LVC: 2.5V/cell × 16 = 40V to prevent damage.
36
How do you calculate total kWh capacity when paralleling batteries?
Correct: B) Parallel: Total kWh = individual kWh × number of batteries.
37
What communication protocol do many modern battery systems use with inverters?
Correct: B) CAN bus is standard for battery-inverter communication.
38
What is 'C-rate' in battery terminology?
Correct: B) C-rate = charge/discharge rate relative to capacity (1C = full in 1hr).
39
What is the energy content of a 48V, 200Ah battery system?
Correct: B) kWh = V × Ah ÷ 1000 = 48 × 200 ÷ 1000 = 9.6 kWh.
40
What happens if you connect batteries with significantly different SOC in parallel?
Correct: B) Different SOC causes high current equalization - potential damage.
SECTION 4: INSTALLATION, CODE & SAFETY (Questions 41-50)
Answered: 0/10
41
What is the maximum voltage for a PV system on a residential dwelling per NEC 690.7?
Correct: C) Residential PV max 600V DC per NEC 690.7.
42
Before working on a solar array, the FIRST safety step should be:
Correct: C) First: isolate power by opening DC disconnect and verifying 0V.
43
What is the NEC requirement for equipment grounding conductor sizing for a 30A PV circuit?
Correct: D) #8 AWG minimum EGC for PV circuits per AHJ requirements and best practices for solar installations.
44
Energy storage systems (ESS) are covered under which NEC article?
Correct: C) NEC Article 706 covers Energy Storage Systems.
45
What PPE is required when working with battery systems above 50V?
Correct: C) Full PPE required: insulated gloves, safety glasses, arc-rated clothing.
46
What is the minimum working clearance in front of electrical equipment rated 0-150V per NEC 110.26?
Correct: B) NEC 110.26: 3 feet minimum for 0-150V equipment.
47
What labeling is required at the main service disconnect for a grid-tied PV system?
Correct: B) Warning label required for additional power source per NEC 705.10.
48
When installing conduit for PV circuits, what is the maximum fill percentage for 3+ conductors?
Correct: B) NEC Chapter 9 Table 1: 40% fill for 3+ conductors.
49
What is the proper torque specification procedure for electrical connections?
Correct: B) Use manufacturer's torque specs with calibrated torque wrench.
50
What is the primary purpose of arc-fault protection in PV systems per NEC 690.11?
Correct: B) Arc-fault protection reduces fire risk from DC arcs.