Electrical Bidding Calculator
SunFusion Energy Systems Inc - Professional Electrical Estimates
Project Size
Pricing Rates
Industry range: $3.50-6.00/sq ft
Wire, panels, fixtures, devices
Project mgmt, permits, inspections
Project Specs
Energy Storage
Includes:
- ✓ Dedicated ESS space (garage)
- ✓ 60-amp backed-up capacity
- ✓ Four ESS-supplied circuits
- ✓ Transfer switch space reserved
- ✓ Sol-Ark 15K/18K ready
- ✓ Guardian Shell compatible
Detailed Cost Breakdown
Labor Cost
$60,060
48.4% of total
Materials Cost
$50,570
40.7% of total
Project Services
$7,020
5.7% of total
ESS-Ready Infrastructure
$6,500
5.2% of total
Total Project Cost
$124,130
Payment Schedule
Down Payment (10%)
Upon contract signing
$12,413
Rough Completion (40%)
After rough inspection
$49,652
Finish Phase (30%)
Mid-finish installation
$37,239
Final Payment (20%)
Upon final inspection
$24,826
Payment Terms: 10-14 days from invoice date. Accepted methods: ACH (preferred), Check, Credit Cards
Per Unit Cost Analysis
Per Circuit
$1,379
90 circuits total
Per LED Fixture
$806
154 fixtures total
Per Outlet
$771
161 outlets total
Per Switch
$1,773
70 switches total
Project Timeline
21
Rough Electrical Phase
Sub-panels, circuit rough-in, wire pulling, box installation
2 licensed electricians
20
Finish Electrical Phase
Outlets, switches, fixtures, devices, panel trim-out
2 licensed electricians
2
Service & Final
Final connections, testing, walkthrough, documentation
2 licensed electricians
Total Project Duration
43 Working Days
Industry Comparison
Labor Only Rate
$4.62/sq ft
Combined Rate
$9.55/sq ft
Competitive Pricing: Both rates within industry standards for premium residential work