Professional Installation Requirements & Pricing Guide above and beyond the Energy Storage Unit Purchase

Base Installation Components

  • πŸ”§ Standard Installation Labor: 4-8 Hours
  • πŸ”§ Complex Installation Labor: 1-3 Days
  • ⚑ Power Shutdown Period: 30-60 Minutes
  • ⚑ Complex Power Shutdown Period: Up-To 8 Hrs
  • πŸ—οΈ Wall Mounting: 60 Minutes
  • πŸ“‹ System Testing & Verification: 1 Hour

Load Center Requirements

  • ⚑ 225A Load Center: $750
  • ⚑ 400A Load Center: $2,250
  • πŸ“¦ Includes:
    • - Main Breaker
    • - Ground Bar Kit
    • - Neutral Bar Kit
    • - Weather-Rated Enclosure

Distance & Complexity Pricing

  • πŸ“ Base Distance (0-10'): Included
  • πŸ”Œ Every Additional 10': +$500
  • πŸ“Š Distance Scale:
    • - 11-20': +$500
    • - 21-30': +$1,000
    • - 31-40': +$1,500
    • - 41-50': +$2,000
    • - Up to 500': +$25,000

Additional Components

  • πŸ”Œ Conduit & Fittings: $10/ft
  • πŸ”§ Junction Boxes: $75-150 each
  • ⚑ Circuit Breakers: $25-95 each
  • πŸ“‘ Communication Gateway: $350
  • πŸ›‘οΈ Surge Protection: $200-450
  • πŸ”Œ Feed Through Lugs: $51

Installation Complexity Factors

  • πŸ—οΈ Wall Reinforcement: +$500-1500
  • πŸ”¨ Concrete Wall Mounting: +$300-600
  • 🏠 Second Story Installation: +$2500
  • πŸ”Œ Panel Upgrades Required: +$2,000-4,000
  • 🚧 Trenching Required: +$17-25/ft
  • πŸ“ Permit Fees: Vary by Location

Professional Labor Rates

  • πŸ‘· Consulting: $2500 3hrs including Drivetime
  • πŸ‘· Consulting Outside of California: $3000 Per Day Plus Airfar
  • πŸ‘· Master Electrician: $225-450/hr
  • πŸ”§ Journeyman: $185-300/hr
  • 🚚 Travel Time: $175/hr
  • πŸ“‹ System Programming: $250
  • βœ… Final Inspection for Warranty: $500

Important Installation Notes

  • ⚠️ Final pricing subject to site inspection
  • πŸ“‹ Permits not included in base pricing
  • πŸ—οΈ Structural modifications quoted separately
  • ⚑ Utility upgrades may be required (Depending on the ESS purchased)
  • πŸ” Pre-installation inspection required